<td id="ubv4b"></td>

  • <p id="ubv4b"></p>
      1. <table id="ubv4b"><option id="ubv4b"></option></table>

        Product classification

        Contact

        Zhejiang Ruifeng Machinery Equipment Co., Ltd.

        Contact person: Mr. Ma

        Tel: 0572-8186086

        Mobile phone: 18905728938

        E-mail: 234374094@qq.com

        Website: www.healthcontentplus.com

        Address: 88 Tianxin Road, Xinshi Town, Deqing County

        Biochemical pool

        Your current location: Home page >> Products >> Hanging plating production line

        Biochemical pool

        • Taxonomy:Hanging plating production line

        • Click times:
        • Date of release:2018/12/17
        • Online inquiry
        Detailed introduction


        Biochemical pool




        Sewage treatment with time procedures is provided instead of continuous space procedures. The biochemical tank system does not need primary settling tank, secondary settling tank and sludge reflux system. It has ideal static settling and good separation effect. It can be used in chemical industry, petroleum, electric power, steel, textile, printing and dyeing, transportation, storage, food brewing, fermentation, water treatment, seawater desalination, etc.




        Matters needing attention


        (1) Under hydraulic impact, bundle fillers in anaerobic and aerobic biochemical ponds may occur filament winding, agglomeration and fracture. The winding and agglomeration may be caused by disadvantageous installation, which can be solved by properly increasing hydraulic load and aeration intensity. Fiber bundle breakage should be replaced in time.




        _At the beginning of commissioning of the aerobic biochemical pond, the aeration rate should start from a small amount of air, and gradually increase with the increase of the water inflow to ensure that the dissolved oxygen in the wastewater of the biochemical pond is about 2-4 mg/l.




        (3) During the debugging stage, the inlet and outlet water quality of anaerobic and aerobic biochemical pools should be sampled weekly to understand the changes of water quality and the growth of biofilm.




        (5) Anaerobic tank and aerobic biochemical tank should reserve a bundle of elastic three-dimensional filler, the upper end of the rope is tied to the guardrail of the operating platform, the filler part falls naturally into the wastewater, the lower end should not be fixed. After debugging for a period of time or daily operation, the bundle of filler can be pulled out of the water surface to check the growth of biofilm.


        The address of this article:http://www.healthcontentplus.com/en/product/565.html

        Key word:

        Recently browse:

        Zhejiang Ruifeng Machinery Equipment Co., Ltd.

        Contact person: Mr. Ma

        Tel: 0572-8186086

        Mobile phone: 18905728938

        E-mail: 234374094@qq.com

        Address: 88 Tianxin Road, Xinshi Town, Deqing County

        Powered by Clouds platform  Technical Support:zhongqi
        Quick link

        99热这里只有精品免费播放,亚洲国产人成自久久国产,日本成本人片免费高清,黑人50厘米全进去视频
        <td id="ubv4b"></td>

      2. <p id="ubv4b"></p>
          1. <table id="ubv4b"><option id="ubv4b"></option></table>